Strong enough to hang from. We would have preferred that he had measured the drop down before hand so that the trim would have fit. We don't plan to hang from it.
Monday, June 27, 2011
Monday, April 25, 2011
Friday, April 15, 2011
New Tile Selection
We have changed the tile selection...Same colour and still Travertine, but instead of filled and honed, we have chosen the tumbled
We will use 16x24 off set in a brick pattern on both the floor and the shower. The tic-tac tile will be the shower floor. The polished marble will be the counter top |
Here is the tic-tac tile pattern up close |
Here is the tumbled Travertine up close |
Wednesday, April 13, 2011
Day Three of Renovations
Everything came out of the bathroom today and they removed the bathroom floor and the shower pad.
The last pic is the air scrubber that is pulling everything from the room and sending it outside.
Day One of Renovations
Insulation and vapour barrier at last!
After a winter with none this was a welcome first day of renovations.
Hopefully that will also solve the crazy amount of dust that we have in the house!
Diesel's Hard Hat
I keep a mask outside of the bedroom/bathroom to wear before I go in.
Diesel brought it to me so that he could try it on!
Silly Goose!!!
Subscribe to:
Posts (Atom)